Plans, and the decisions behind them. One line, read thirteen ways.
The wadi centreline, Al Khuzam · 8.2 km
Introduction
Urban Intelligence
Not a smarter drawing. A harder interrogation.
A masterplan is a promise of value, made before any concrete is poured. Most plans keep half of it: the landscape works, the roads flow and the land budget balances. The other half is the half that pays. It is only free while the plan is still a drawing, and if no one finds it then, the client finds it later, at a cost.
I have drawn plans from three sides of the table. I was the consultant, in London and then Dubai, drawing what the client asked for and making it as good as the brief allowed. Then I sat with planning authorities, reading other people’s plans and deciding what could go ahead in development. Now I sit with the owner, where the plan has to pay for itself. The drawing has not changed much across those years. The questions I asked of the masterplan certainly have.
Urban intelligence is not a smarter drawing, but it is a harder interrogation. It puts one question to every plan: who is this masterplan for, and what is that worth?
The line in this chapter: wadi centreline Figure-ground
Al Khuzam
The call
Turn the ribbon of apartments to face the wadi, and fix the street fronts before the building lines are set.
014ALKHZM / 01015
The wadi runs for just over eight kilometres. Everything else in the plan is arranged around it.
Wadi park centreline True shape
016ALKHZM / 01017
ALKHZM / 01 · Where Khuzam sits
Khuzam sits among the city's new destinations.
The North Pole is next door to the west, the airport to the east and Expo 2030 to the south-east. King Salman Stadium, the Black Gold Museum and King Abdulaziz Park sit on Airport Road, about 11 to 12 km away. King Salman Park is about 25 km away.
018ALKHZM / 01019
ALKHZM / 01 · The identity
Khuzam is where Riyadh comes home.
The airport, Expo and Diriyah each give Riyadh something the world will come to see. Al Khuzam has a different job. Expo is its neighbour, and Khuzam should leave spectacle to Expo.
Khuzam is not another destination. Khuzam is where you stay.
More than eight kilometres of Wadi Al-Sulay run through the middle of Khuzam. Visitors will drive to the wadi for the view and the park. For the people who live along it, the wadi is the spine of ordinary life: the shaded walk to the shops, the water you walk beside at dusk, the nature your children will play in, and the evening the whole neighbourhood spends outside because the wadi has cooled the air. Diriyah and old Riyadh grew along Wadi Hanifa. Khuzam can carry that pattern into the city's new north.
Khuzam matters to the rest of north Riyadh. The city's north is growing in very large districts, and most are laid out for the car. Khuzam is one of the first districts of its size with a wadi running through it. If the wadi and its centres work, the districts that follow have a model that isn't built for the car. Riyadh is building great places to visit. Khuzam will show how the city lives.
Khuzam is where Riyadh comes home.
The airport
is where the world arrives
Expo
is where the world gathers
Diriyah
is where the nation remembers
Khuzam
is where Riyadh comes home
020ALKHZM / 01021
ALKHZM / 01 · Essay + observations
The wadi is the address. The study starts at its edge.
Al Khuzam is a large district in north Riyadh, laid out along the length of a wadi. The villa neighbourhoods sit on either side of the wadi park.
This study looks at how the edge of the park could work as a place to live and to spend an evening. The study makes five observations, and the six moves that follow come from them.
05 · Observations
01
The wadi gives Al Khuzam a natural identity: one landscape that every district shares.
The wadi park runs for just over eight kilometres through the district.
02
The wadi edge is long enough to hold four distinct places along one spine.
A sequence of places reads more clearly than one continuous frontage.
03
Homes near a centre can walk to daily life, and homes at the far end of a district have a longer walk.
Each district has one centre today.
04
The frontage that faces the park is where people see and use the wadi every day.
Homes and shops that face the park make the park part of daily life.
05
The edge of the park sets the character of the whole district.
What happens along the frontage shapes how people see Al Khuzam.
022ALKHZM / 01023
ALKHZM / 01 · Four districts
The further a villa sits from a centre, the longer the walk to daily life.
Each district has one centre today. Homes near the centre can walk to daily life, and homes at the far end of the grid have a longer walk. Moves 04 and 06 put a centre at every road break on the ribbon, so every home is a short walk from one.
Now · one centre per district · darker plots are closer
Best servedD1
Partly servedD2
Least servedD3
Well servedD4
024ALKHZM / 01025
ALKHZM / 01 · Moves
06 Moves
Six small moves make the ribbon, and together they turn the wadi landscape into an address.
Principle diagrams, not to scale. The line is the wadi.
01 · The villa grid stays as it is
The back of the plan stays quiet and private.
02 · The wadi is the address
The wadi park is the spine of the whole district.
03 · A service lane takes the cars
Deliveries and parking stay off the front.
04 · The ribbon
Apartments of four to six storeys sit over shops and cafés.
05 · The front turns east
Every apartment faces the park, not the road.
06 · Gardens in walking reach
Each garden is overlooked by homes and has something going on, so people walk to it.
026ALKHZM / 01027
ALKHZM / 01 · Four places
Four places sit along the spine, each one facing the wadi.
Art01
Art is the cultural end, with studios and workshops the western homes can walk to.
Heart02
Heart is where the evening crowd gathers, on the steps and around the stage.
Play03
Play has play gardens and a running loop along the water, open to everyone.
Gate04
Gate is the arrival district, with the station, the towers and the steps down to the wadi.
028ALKHZM / 01029
ALKHZM / 01 · Section · West to east
One continuous active frontage faces the wadi.
The ribbon · 4–6 storeys
Villa gridServiceApartments over retailWadi park →
Swipe the section →
This is an indicative principle section. Heights are illustrative.
030ALKHZM / 01031
The ribbon at dusk. Design and image: Wesley Sturridge, rendered with Rendair. Concept, not a sanctioned design.
An ordinary evening on the wadi.
The wadi edge at night. Design and image: Wesley Sturridge, rendered with Rendair. Concept, not a sanctioned design.
034ALKHZM / 01035
YNBCC / 02
Yanbu / KSA
City centre / Regeneration masterplan
Royal Commission for Jubail and Yanbu, 2023–25
Urban Planning Lead
Yanbu City Centre
The call
Re-cut the plots into five districts, and give the centre room to grow.
036The line in this chapter: the green link, from the Rim into the city. Parcel plan, 2024.
One green link runs from the Rim lagoon through the Heart and into the city. The five districts hang along it.
The green link, traced on the 2024 parcel plan. Not to scale.
038YNBCC / 02039
YNBCC / 02 · 2015 → 2024
A group of plots became five districts and a route to the water.
420,000 m²
Floor space in the 2015 plan
696,000 m²
Floor space in the 2024 plan, without parking
+66%
More floor space on the same streets
6,600 → 19,354
Parking spaces, all moved inside the buildings to free the streets
2015 · approved parcel planThe 2015 plan divides the centre into individual plots, each sold on its own.
2024 · proposed parcel planThe 2024 plan sets out five districts of flexible blocks, with a green link that runs from the Rim through the Heart.
040YNBCC / 02041
YNBCC / 02 · Five districts
The streets stayed. The plots grew.
I kept the 2015 streets and re-cut the plots between them. Where a street was wider than its traffic needed, the spare width went to the plots on either side. The one exception is Al-Tijarah Street, which was widened into a boulevard (page 044), and the black line marks the new plot edge. The traffic engineer reviewed every change to the roads.
The re-cut plots fall into five districts. Each district has its own character, and the green link joins the five districts to the Rim. The re-cut plan carries 66% more floor space than the 2015 plan, and the infrastructure was upgraded for the new vision.
Retail and CommerceThe northern blocks, with the hospital on the King Fahd corner.
ResidentialThe strip along King Fahd Road.
WaterfrontThe blocks that face the Rim.
HeartThe central block, where the green link meets the city.
Government and CivicThe southern blocks, around the existing civic buildings.
Existing buildingThe plan keeps the buildings already on the site.
Build-to lineThe new plot edge, where street land joined the plot.
Green linkFrom the Rim, between Retail and the Heart, to King Fahd Road.
Block plan, 2024. Design: Wesley Sturridge, Royal Commission for Jubail and Yanbu.
042YNBCC / 02043
The city centre from the air, 2024 masterplan. Design and images: Wesley Sturridge, Royal Commission for Jubail and Yanbu, 2024.The city centre from across the Rim. Design and image: Wesley Sturridge, Royal Commission for Jubail and Yanbu, 2024; re-rendered with Rendair, 2026.
YNBCC / 02 · Streets
The main street was widened into a public boulevard.
Al-Tijarah Street was made wider to create a public boulevard. The plot edges stepped back, and the new setback became public space along the street. I then redrew each junction for its traffic: the turns the junction has to carry, and the access each plot needs. Where a lane carried no traffic, the pavement grew. Where a turn needed room, the road widened.
Before
123456
After. King Fahd Road and Al-Tijarah Street, 2024. Imagery: Google Earth.
1, 4, 5The pavement widens at the road edge.
2The road widens for the turning traffic.
3The old kerb comes out, and the road widens.
6The new setback widens the street into the public boulevard and sets the new plot edge.
BlackThe kerb changes.
ArrowsThe traffic movements the new kerbs were drawn for.
048YNBCC / 02049
YNBCC / 02 · The hospital
A hospital arrived halfway through the plan.
While the masterplan was being drawn, a hospital came to the city centre. I placed the hospital on plots 303 and 304, on the King Fahd corner, where the framework had already marked a gateway. The design statement set four rules for the site.
AccessNo general vehicle access from King Fahd Road. The entrances sit on the side streets.
HeightUp to nine storeys.
ParkingIn the podium, inside the buildings.
CornersThe buildings come up to both street corners, so the gateway still reads as a gateway.
01 / Site plan02 / Massing and access
Site plan and massing. Design statement, plots 303 and 304, December 2023. Design: Wesley Sturridge, Royal Commission for Jubail and Yanbu.
050YNBCC / 02051
An illustrative view of the hospital plots: the courtyard between the Hospital, Hospital 2 and the commercial block. Design: Wesley Sturridge, Royal Commission for Jubail and Yanbu; image re-rendered with Rendair from the massing, 2026.
YNBCC / 02 · On the street
The plots gave land to the street, and the street gave them an address worth paying for.
01 / The setback became café terraces, so every shop trades onto the street02 / The green link brings the lagoon to the city’s front door03 / The boulevard opens into a square, so the shops face people, not cars
2024 masterplan. Design and images: Wesley Sturridge, Royal Commission for Jubail and Yanbu, 2024.
052YNBCC / 02053
The main street on a car-free evening, 2024 masterplan. Design and images: Wesley Sturridge, Royal Commission for Jubail and Yanbu, 2024.
RAQ / 03
c. 24°30′ N — 51°20′ E
Ras Abu Qames / KSA
Regional masterplan / Trade zone
Parsons · strategic masterplanning advisor · 2016
Ras Abu Qames
The call
Sell the good beach. Give industry the poor one.
056The line in this chapter: the coast, Qatar border to UAE border057
The site has some 109 kilometres of coast between two borders. The plan has to decide what faces the water.
The site coastline, from the development framework. Measured at the drawing’s own scale: c. 109 km. Dots every 10 km.
058RAQ / 03059
RAQ / 03 · First direction
The first direction put petrochemicals and a cargo port on the bay, the best beach on the coast. I pushed to move industry to the poorer shore and keep the bay for homes and a resort, because a good beach sells and a poor one does not. The team and the client agreed, and the coast was redrawn.
CityResort living, residential, mixed-use residential, town centre, CBD
WorkPort, airport, logistics, light industries, heavy industries / petrochemicals
LandAgriculture, energy farm
Earlier zoning direction, redrawn. Positions and shapes as drawn; not to scale.
060RAQ / 03061
RAQ / 03 · Scenarios
04 Scenarios
Four futures were drawn for the same coast, and each was tested for land, jobs and value before the plan was redrawn.
Energy priority
Industry30–35%
Communities10–15%
City centre2–5%
Reserves40–45%
Economic priorityChosen
Industry30–35%
Communities20–25%
City centre5–10%
Reserves20–25%
Destination driver
Industry20–25%
Communities30–35%
City centre10–15%
Reserves20–25%
Environment priority
Industry15–20%
Communities10–15%
City centre2–5%
Reserves50–60%
Scenarios drawn by Wesley Sturridge for the Parsons team, development scenarios study, section 7.4. Shares of land as published.
062RAQ / 03063
RAQ / 03 · Decision
01 Decision
One scenario was carried forward.
Economic priority.
The scenario ranked highest in the technical evaluation, and it became the basis for the concept masterplan and the infrastructure design.
Development framework, section 8.2
Key features
01
Homes, town centres and the resort take the bay, the best beach on the coast.
02
Industry and the port take the peninsula and the poorer shore.
03
A free trade zone uses the border position between Qatar and the UAE.
04
An airport, seaports and transit hubs serve the trade zone.
064RAQ / 03065
Concept image. Design: Wesley Sturridge, rendered with Rendair.
RAQ / 03 · Development framework
Economic priority · area distribution
Industry30–35%
Communities20–25%
City centres5–10%
Reserves / undeveloped20–25%
Environmental reserve
The coastc. 109 km
Industry takes the port peninsula and an inland block along the highway. Communities take the shore between them. City centres sit where the roads cross.
Redrawn from the development framework drawing Wesley Sturridge made for the Parsons team (for MODON). Area shares as published.
068RAQ / 03069
ALULA / 04
26°37′ N — 37°55′ E
AlUla / KSA
Masterplan / Heritage & landscape
Gillespies · Associate Director · 2019–20
Al Ula
AA′
The call
An old civilisation and a new one share one valley. Give each its own ground, and protect the landscape between them.
070The line in this chapter: section A–A′, down the valley, north to south071
Down the valley, the section runs from the oldest ground to the newest. Open valley floor separates the old town from the new city, and the plan keeps that ground open.
Long section A–A′, traced down the valley floor on the Stage 3 masterplan and drawn straight. Not to scale.
072ALULA / 04073
ALULA / 04 · Six moves
Growth goes south, into the open valley, away from the oasis and the old town.
Three moves work in the old valley: the plan repairs the town centre, bridges the wadi and gives the wadi back to nature. Three moves work in the south: a new masterplan, a new city district and a new park.
MugayiraAirport010203040506
01 · Regenerated town centre02 · Wadi bridge03 · Naturalised wadi & public realm04 · South AlUla masterplan05 · New South AlUla city district06 · New district park
Stage 3 masterplan, Gillespies, shown in grey. Development in white. Red: section A–A′. Images: Gillespies project team.
074ALULA / 04075
Image: Gillespies project team.
ALULA / 04 · Data
80%
of AlUla County is under landscape protection. The first number in the plan is the land it will not build on.
70%
of building-permit applications fall in Central and South AlUla, where 65% of the urban area is vacant
50%
renewable energy target for the county’s infrastructure
2035
horizon of the Framework Plan
The plan spreads 9,417 hotel keys across the county.
Light-touch tourism: keys by ring, from the core outward
A2,08722%Inner ring · the core
B2,91031%Second ring
C3,83541%Third ring · the widest share
D5856%Outer ring · deep landscape
Figures: AlUla Framework Plan, Prior + Partners for the Royal Commission for AlUla.
078ALULA / 04079
ALULA / 04 · Principles
10 Principles
The Framework Plan set ten principles, and every masterplan and project in the county has to answer to them. The growth strategy started from these principles.
01
Safeguard the natural and cultural landscape
02
Celebrate heritage, culture and arts as a global destination
03
Sustain all ecological systems and wildlife
04
Promote balanced agriculture
05
Develop light-touch tourism
06
Ensure subtle connectivity and accessibility
07
Revitalise, restore and regenerate the built environment
08
Enable local community development
09
Incorporate imaginative infrastructure in all systems
10
Integrate invisible security
AlUla Framework Plan and Guidelines: Prior + Partners for the Royal Commission for AlUla. Planning update, December 2019: Gillespies.
080ALULA / 04081
ALULA / 04 · Essay
The valley is protected by what is left unbuilt.
AlUla is a narrow valley with thousands of years of history. Hegra became the Kingdom’s first UNESCO World Heritage Site, and the people of AlUla are rightly proud of the civilisation their valley holds. Families still live in the town, and the valley is their home.
Visitors come to see this heritage, and the town needs room to grow. The urban design question was how to bring the old civilisation, the new city and the landscape together without one spoiling the others.
The growth strategy was my part of the work. The strategy carried the Framework Plan down to the detail of each community, and it rested on two kinds of knowledge: the history of the old town, and how the existing town works from day to day.
The plan answers by giving each its own ground. In the old valley, all work stays inside existing edges: the town centre is repaired for the people who live there, the wadi is bridged, and the wadi is given back as public space. Where the valley opens out to the south, the plan places the new homes, the city district and the park.
Two civilisations share the valley, and the landscape between them stays as it was found.
082ALULA / 04083
WSAFR / 05
c. 24°45′ N — 46°25′ E
Riyadh / KSA
Masterplan / Landscape & hospitality
Gillespies · Associate Director · 2019–20
Wadi Safar
The call
Follow the ground, not a grid. The ridges take the views, the valleys take the farms, and half the land stays untouched.
084The line in this chapter: the spine, from the Wadi Hanifah end westward085
One spine runs through a folded landscape. Everything else is placed lightly on either side of it.
The site’s centreline, traced on the masterplan, the same way round as the map. Not to scale.
086WSAFR / 05087
WSAFR / 05 · Illustrative masterplan
Resorts sit on the ridges for the views, and farm plots follow the valleys. Golf and riding take the land that is already flat. Half the site, the wadis, cliffs and escarpments, stays as it is, and that untouched half gives every plot its view.
A grid would level the ridgesThe plan follows the ground
Illustrative masterplan, Gillespies, January 2020, shown in grey. Red: the spine. Black: site boundary.
088WSAFR / 05089
WSAFR / 05 · Data
260
people live in each square kilometre, a sixteenth of the density of Riyadh. Low density is the product.
Wadi Safar260
Jeddah2,500
Riyadh4,300
People per km². Wadi Safar at full build-out; city figures as given in the masterplan.
15,718
people at full build-out · residents 6,610 · staff 6,268 · visitors 2,840
60.6 km²site area
Farm plots20.29 km²33%
Leisure5.19 km²9%
Hospitality3.11 km²5%
Community & utilities0.36 km²1%
Roads & open space2.06 km²3%
Undevelopable29.62 km²49%
200
farm plots: 170 of 100,000 m², 30 of 50,000 m²
49%
of the site left undeveloped: wadis, cliffs and escarpments
2.2M m²
gross floor area; 78% of it in the farm plots
Wadi Safar detailed masterplan, executive summary. Gillespies with Buro Happold.
090WSAFR / 05091
WSAFR / 05 · Character areas
06 Character areas
Character areaLandPeople
01The ValleyArrival from Diriyah Gate along the wadi bed4%1%
02Green CoreGolf, clubhouse and the central leisure heart15%29%
03Northern PlateauFarm plots on the high ground19%24%
04The FairwaysThe largest area: farm plots in the western wadis34%21%
05The HillsSteep ground, the lightest touch14%6%
06Southern PlateauFarm plots and hotels on the southern edge14%19%
The land drew the plan. Each of the six character areas was read from its own ground and given its own mix of uses.
The site runs 15 km from the Diriyah Gate end to the western tip. The Green Core holds 15% of the land and 29% of the people.
Character areas redrawn from the Wadi Safar detailed masterplan, executive summary, figure 1.16. Shares as published. Gillespies with Buro Happold.
092WSAFR / 05093
Image: Gillespies project team.
WSAFR / 05 · Fragments
The wadi was here first, and the plan is built around it.
01 / The resorts sit on the land, so the hills stay as the hills02 / The ridges are kept for the views03 / The wadi floor becomes the shared park
096WSAFR / 05097
WSAFR / 05 · Essay
The plan follows the ground.
Wadi Safar lies west of Riyadh, beyond Wadi Hanifah and close to At-Turaif, the UNESCO-listed first capital of the Saudi state. It is a folded landscape of ridges and dry valleys, and it has survived because nobody needed it.
The brief was for an exclusive address: hotels and resorts, leisure and recreation, community facilities, and 200 farm plots of five to ten hectares for second homes, with secure access for residents and guests.
My part was the design of the masterplan. The plan follows the ground rather than a grid. Resorts sit on the ridges for the view. Farm plots follow the valley floors. Roads take the contour.
098WSAFR / 05099
DFRSN / 06
c. 24°50′ N — 46°50′ E
North-east Riyadh / KSA
Regional district masterplan
Parsons for the Ministry of Housing · Senior Master Planner · 2016–17
Dahyat AlFursan
The call
The brief asked for housing. Build a regional district for Riyadh.
100The line in this chapter: the 84 m primary network, 30.6 km101
One loop sends arms out to every edge. The 84 m roads carry the city’s traffic, so the neighbourhoods inside them can be quiet.
The 84 m right-of-way network, 30,594 m in total, from the Stage 3 road hierarchy plan.
102DFRSN / 06103
DFRSN / 06 · Iterations
04 Iterations
We drew four plans in six months, and the final plan followed in March 2017. The population swung from 439,000 down to 260,000 and settled at 361,641 as we tested the brief against the market and the ground.
Final, March 2017
72,348 units25.8M m² GFA361,641 residents
July 2016Units85,900GFA m²20.99MPopulation439,000Oct 2016Units46,000GFA m²13.79MPopulation260,000Nov 2016Units60,000GFA m²14.35MPopulation357,780Dec 2016Units67,000GFA m²25.06MPopulation340,000
homes house 361,641 people on 40 km² beside the airport. The plan is a regional district at the scale of a city.
4,011 ha
site area
25.8M m²
gross floor area
0.64
overall floor area ratio
15%of the land is park, landscape and linear park
Roads, right of way34.1%
Residential villas & semi-detached23.2%
Apartments & mixed use10.5%
Parks, landscape & linear park15.0%
Commercial4.5%
Public & educational facilities7.0%
Compound & utilities6.1%
The wadis that cross the site are kept as a lattice of parks, and the parks hold 15% of the land.
Land use summary, table 3.10, Stage 3 detailed master plan, April 2017. Shares grouped from the published table.
106DFRSN / 06107
DFRSN / 06 · The centre
A housing brief got a city centre, with the Grand Mosque at its heart.
01 / The city centre sits inside the loop, around the Grand Mosque02 / Gardens and water lead people up to the mosque03 / The civic plaza gives the district a public square, with room for an outdoor cinema
Stage 3 master plan, 2017. Parsons for the Ministry of Housing.
108DFRSN / 06109
DFRSN / 06 · The neighbourhoods
The homes come with streets and parks worth living beside.
04 / Mixed-use streets put shops and cafés under the apartments05 / The villa neighbourhoods sit next to the equestrian parks06 / Townhouse streets are planted for shade from the front door to the car
Stage 3 master plan, 2017. Parsons for the Ministry of Housing.
110DFRSN / 06111
DFRSN / 06 · Essay
Housing was the brief. A district was the answer.
Dahyat AlFursan came from the Ministry of Housing as a housing project for north-east Riyadh: 40 square kilometres between King Khalid International Airport and the city, planned from an empty site in eleven months.
The plan is built on a loop. An 84-metre boulevard circles the central districts and sends arms out to every edge, so through-traffic stays on the loop and the neighbourhoods inside it can be quiet. The wadis that cross the site were kept as a lattice of parks rather than engineered away.
Housing was the brief, but the plan made a regional district for Riyadh: a mall and cultural district at the gateway, a central park and Grand Mosque at the heart, schools and mosques at every neighbourhood centre, and a choice of villas, townhouses, semi-detached homes and apartments.
112DFRSN / 06113
Chapter II · The Gulf
Between 2013 and 2018, at Parsons and AE7, I worked on four plans for the Emirates: a canal, a financial district, a healthcare city and a district on the Creek.
Canal-side district / Waterfront, residential & park
Parsons, 2013–14, Senior Master Planner · AE7, 2017–18, design team · for Meydan, RTA and Meraas
The line in this chapter: the canal, 3.2 km Business Bay to the Gulf · masterplan, AE7
Old Dubai, north of the cut: an island
Dubai Water Canal
The call
Cut the canal and old Dubai becomes an island. Every plot along the cut becomes waterfront.
116DWCNL / 07117
The canal adds three kilometres of new water, cut through a built city. It passes under Sheikh Zayed, Al Wasl and Jumeirah roads, and gives the Creek a second mouth on the sea.
Canal edges and centreline traced from the AE7 masterplan. Road bridges at 8.5 m clearance.
118DWCNL / 07119
DWCNL / 07 · Passes
02 Passes
I worked on the canal twice. At Parsons I drew the first concept when the canal was announced, and at AE7 I was on the masterplan team while the canal was being built.
01
Parsons · 2013–14
The first concept came as the canal was announced: a canal-side district of homes and waterfront retail, a remodelled Safa Park and a crystal lagoon.
02
AE7 · 2017–18
The second pass came with the canal under way: a masterplan for the land along both banks, from the Gulf to Sheikh Zayed Road.
First pass: the canal mouth at Jumeirah. Design: Parsons, 2013; image re-rendered with Rendair, 2026.
120DWCNL / 07121
DWCNL / 07 · Data
8,400
homes house 39,000 people on 160 hectares of new waterfront between the Gulf and Sheikh Zayed Road.
1.6M m²
masterplan area
39%
open space
3
pedestrian bridges
Section through the canal
80–120 m wide · road deck in red · vertical scale ×5
Length3.2 km
Width80–120 m
Depth6 m
Clearance under road bridges8.5 m
Pedestrian bridges3
Marine transport stations4
Public realm80,000 m²
Announced / opened2013 / 2016
District figures: AE7 project record. Canal figures: as published at opening, 2016.
122DWCNL / 07123
The canal promenade at dusk, with the gateway building from the 2013 concept. Design: Parsons, 2013; image re-rendered with Rendair, 2026.
SHJFD / 08
c. 25°19′ N — 55°22′ E · Al Khan, Sharjah / UAE
Concept masterplan / Office, residential, hotel & civic
Parsons for the Sharjah Chamber of Commerce and Industry · Senior Master Planner · 2016–17
The line in this chapter: the ceremonial axis, 936 m from the Expo Centre gateway through the Chamber of Commerce
Sharjah Financial District
The call
The client’s headquarters is the landmark. Build low beside it and tall at the ends, so every view leads back to it.
126SHJFD / 08127
One axis runs 936 metres, with the Chamber of Commerce already standing at its centre. The plan makes the Chamber the focus of the district and lets the buildings rise away from it.
Blocks, ring road and axis from the illustrative masterplan: 936 × 167 m. Cross-axis to the lagoons dashed.
128SHJFD / 08129
SHJFD / 08 · Options
03 Options
Three pre-concepts went to the Chamber in 2016. The Chamber’s leadership took two of them: the ceremony of the first and the courtyards of the third.
1 + 3The refined framework, 2017
01 · Ceremonial PlazaChosen
A wide boulevard runs up the central axis to a ceremonial plaza in front of the Chamber.
02 · Civic Plaza
A public plaza wraps around the Chamber, with a linear park along the spine.
03 · CourtyardsChosen
Activity turns inward to courtyards on the axis, and traffic stays at the edge.
130SHJFD / 08131
SHJFD / 08 · Data
4,510
residents, 3,200 jobs and some 300 hotel rooms fit on 10.7 hectares between two lagoons.
238,209 m²
gross floor area
2.2
floor area ratio
c. 1,000
homes
Heights along the axis
Buildings stay low beside the Chamber and rise towards each end, so every view leads back to the Chamber.
Land use program, table 3.2, and population projection, table 3.3. Concept master plan, Parsons, February 2017.
132SHJFD / 08133
The ceremonial axis at lunchtime. Design: Parsons, 2017; image re-rendered with Rendair, 2026.
The spine, looking to the Chamber. Design: Parsons, 2017; image re-rendered with Rendair, 2026.
SHJFD / 08 · Essay
A district built on a view.
Sharjah Financial District was planned around a building that was already there. The Sharjah Chamber of Commerce and Industry owns the site, and its domed headquarters stands at the centre of a 10.7-hectare peninsula between the Al Khan and Al Mamzar lagoons.
Three options went to the Chamber’s leadership in 2016. They chose to combine two: the ceremonial boulevard of the first and the courtyards of the third. The result is a single axis, 936 metres long, running from the Expo Centre gateway through an elevated plaza in front of the Chamber to a residential quarter at the north-west end.
Through-traffic stays on the ring road, with slow access lanes inside. The buildings have no podiums, and shops line the central walk at ground level. Heights rise away from the centre, from four storeys beside the Chamber to twenty-five at the gateway, so the landmark stays in view.
Parsons for DHCC and Tamdeen · Senior Master Planner · 2014–15
DHCC
The call
Keep the height away from the villas already sold, so their owners keep what they paid for.
138The line in this chapter: the site edge, drawn at two scales139
One client gave us two briefs: a new 175-hectare district on the Creek, and a single 2.6-hectare plot inside the existing city. Each plan starts from its site edge.
Site outlines traced from the Phase 2 site context plan.
140DHCC / 09141
DHCC / 09 · Scales
02 Scales
The client gave us two briefs: a new 175-hectare district on the Creek, and a single 2.6-hectare plot inside the existing city.
Site outlines from the Phase 2 site context plan, all at the same scale. The square is 2.6 ha, the Phase 1 expansion plot.
142DHCC / 09143
DHCC / 09 · A · Phase 2 · Options
03 Options
We drew three ways to organise a 175-hectare district around healthcare. The choice turned on the villas already sold: keep the height away from them.
01 · Multiple hearts
Healthcare sits at the gates, with a boulevard between centres. The clinics come too close to the villas.
02 · Necklace
The boulevard loops through the district, with nodes strung along it like pearls. The mid-rise blocks come too close to the villas.
03 · Centres · preferredChosen
One active corridor links two mini-centres to the water and closes the loop along the promenade.
Development framework options, concept master plan report, Parsons, October 2014.
144DHCC / 09145
DHCC / 09 · A · Phase 2 · Data
+2.5M ft²
About 232,000 m², or 17% more floor space than the approved plan, with the height kept away from the villas already sold. The 175 hectares on the Creek become a mid-rise community with healthcare and wellness at its core.
4,675
residential units across 2A and 2B
1,410
hotel rooms, and 1,960 serviced units
17.3M ft²
gross floor area, up from 14.8M approved
33 ha
of water in 2A: the setting for wellness, promenade and retail
2,400
students at a K-12 school with a medical emphasis
10,500
residents in 2A alone
Centres option, the preferred development framework. Concept master plan report, Parsons, October 2014.
146DHCC / 09147
Phase 2: parks as centres. Design: Parsons, 2014; image re-rendered with Rendair, 2026.
DHCC / 09 · B · Phase 1 expansion
4.3
is the floor area ratio on a 2.6-hectare site. The required programme was large and the site was small, so the plan builds upwards, with parking below ground and towers above.
530
apartments for medical staff and families
162
hotel rooms for patients and carers
120
hospital beds, two specialty hospitals
26,146 m²
site area
112,157 m²
gross floor area
2,600
new residents
Land use by site area
Residential + retail38%
Healthcare16%
Hospitality9%
Mosque6%
Open space10%
Roads & utilities21%
BasementsThree levels under the park and access road, leased to the wider DHCC
PodiumsTwo parking levels, screened, retail arcade at ground
TowersMin. 16 m apart; massing keeps the view to the MBR Academic Medical Centre
Section redrawn from figure 4.6; figures from table 3.4 and the land use plan. Stage 3 final master plan, Parsons, August 2015. Heights schematic.
Parsons for Dubai Properties · Senior Master Planner · 2016–17
The line in this chapter: the main street, through the three quarters Illustrative master plan, figure 4.27, Parsons, June 2017. North is to the left.
Dubai Park Avenue
The call
The tower moved the value. Re-cut the same land to face it.
154DPAVE / 11155
One main street runs through all three quarters. It starts in the play quarter at the north, crosses the living quarter at the centre and ends in the work quarter beside the metro.
Tower footprints and the main street traced from the illustrative master plan, figure 4.27, Parsons, June 2017. North is to the left.
156DPAVE / 11157
DPAVE / 11 · Framework
Three quarters on one green spine.
The framework splits the site into three quarters. A linear park runs the full length of the site and ties the quarters together. The park also links the site to two metro stations and to Dubai Creek Harbour. Each quarter gathers its shops, school or mosque around a neighbourhood centre on the park.
North · PlayResidential towers, a school and a planetarium. The quarter closes the northern end of the park.
Centre · LiveThe civic plaza and the two central parks. Homes over shops keep the heart of the site busy day and night.
South · WorkOffices, hotels and serviced apartments, close to the metro station.
Urban planning framework, figure 3.5. Detailed Master Plan Report, Parsons, June 2017, in grey. Red rings: the neighbourhood centres.
158DPAVE / 11159
DPAVE / 11 · Views
The view of the tower set the plan.
The Creek Harbour tower was planned next door as the tallest structure in the world. The plan draws axes from the tower across the site. The axes fix the three grand parks and the plots for the tallest buildings, so the towers behind each park keep a clear view of the tower.
View corridor study, signature towers: plan, left, and view from the tower, right. Appendix C, Detailed Master Plan Report, Parsons, June 2017. Corridors in red, the rest in grey.
160DPAVE / 11161
The linear park and a pedestrian bridge. Parsons, 2017, re-rendered 2026.
DPAVE / 11 · Park and street
The park runs the length of the site.
Bridges carry the linear park over the streets and join it to the central plaza. The park does not stop at the kerb. Every street carries the park on, with the same shade, planting and room to walk.
Grand View Park, looking west towards the tower. Parsons, 2017, re-rendered 2026.
162DPAVE / 11163
DPAVE / 11 · The code
Seventy-four plots, one rule sheet each.
The form code gives each use its own building types. Mixed use has four types: corner, boulevard, gardens and icon, each with low, mid and high-rise versions. A regulation sheet for every plot then fixes the setbacks, the podium, the tower envelope, the shop frontage and the entrances.
74
plot sheets
4
mixed-use types
10–36+
storeys
Left: mixed-use form code, figure 4.4. Right: regulation sheet for plot MU-001. Detailed Master Plan Report, Parsons, June 2017, in grey. Red: shop frontage.
164DPAVE / 11165
DPAVE / 11 · The call
The tower moved the value. The same land was re-cut to face it: hotels became homes.
The re-cut kept the same floor area and changed what filled it. Homes rose by 40 per cent, hotel keys fell by 87 per cent, and the office space stayed in place near the metro. Homes sell off-plan and pay the developer while the towers go up. A hotel needs an operator, and it takes years to pay back.
BeforeAfter, June 2017
Homes
10,23014,335+40%
Hotel keys
4,820645−87%
Retail m²
97,51355,792−43%
Office m²
106,096105,303held
Three passes, same floor area: 1.85 million m²
Jan 2017Concept13,811 homes
Apr 2017Submitted to Dubai Municipality14,328 homes
Jun 2017Detailed master plan14,335 homes
The Lagoons, Detailed Master Plan Report, Parsons for Dubai Properties, June 2017: land use mix and master plan evolution.
Park Avenue North, looking west towards the tower. Parsons, 2017, re-rendered 2026.Grand View Park and the skyline walkway, looking west towards the tower. Parsons, 2017, re-rendered 2026.
166DPAVE / 11167
Chapter III · London
From London, EDAW planned a new neighbourhood for Northampton, a new heart for Doha and a new quarter for the University of Cambridge.
The line in this chapter: the edges of the development sites, each one sold under its own brief
Upton
The call
Pick the builder on design first and on price second. The code sets the standard, and the land sale enforces it.
170UPTON / 12171
The agency built the main streets first. Each site between the streets was sold under its own brief, and the design code held every site edge to the same standard.
Main streets and site edges traced from the Upton development sites plan, EDAW.
172UPTON / 12173
UPTON / 12 · Why a code
The code was not the design. It was the deal.
English Partnerships would not build Upton. It sold the land a site at a time, to different builders, over ten years. The code made them build one place.
01One place, not a row of estates
Every site had its own builder. Sites A and B, the first two built, read as one place.
02Value, not only price
Public land had to go for best consideration, which counted quality and delivery as well as price. With one standard for every bidder, design was scored first and the bid second.
03Density people would accept
About 45 homes to the hectare, twice what planners allowed ten years earlier. That meant more homes on the same land.
04Affordable, and invisible
22% of the homes are affordable, in groups of no more than three, with no outward difference from the homes for sale. The code made that a rule, not a hope.
What a code costs
A code needs someone to champion it and police it. Will Alsop warned that precise rules shut out the new. The code was not written for the architect. It was written for the people who would live there.
Upton in July 2006. The grass swale down the middle of the street carries the drainage that the code required. Photograph: EDAW project files.
1,020homes1997 outline consent
44 hasitesouth-west Northampton
2003Design Codeupdated 2005
How a site was sold
Stage 1
Design only
The Upton Working Group judged every entry against the code and the site brief. Price was not scored.
Shortlist
Six at most
No more than six developers went through to the second stage.
Stage 2
Design plus price
The design score and the financial bid were added together. The highest total won the site.
Sources: Site E Development Brief and English Partnerships Quality and Price Standards, EDAW, May 2006; The Upton Story so far, EDAW, October 2006; The Economist, “Field of dreams”, 29 July 2006.
178UPTON / 12179
UPTON / 12 · The code
One code, four layers.
The Upton Design Code was first published in May 2003. It was updated in March 2005, after the first three sites had tested it. The code sets its rules in layers, from the character of each area down to the street, the block and the use of each building. Every site brief carried the code with it.
01 / Character areas. Four areas step down from the urban boulevard on Weedon Road (red), through the neighbourhood spine (black), to the edge beside the country park (grey)02 / Street types. The main street (red) runs south from Weedon Road through the spine. Streets with sustainable drainage, lanes and mews fill in between03 / Block types. Courtyard blocks (black), mews blocks (grey) and edge blocks set the shape of each plot before a builder draws a house04 / Uses. Offices, live-work units and homes with active ground floors line Weedon Road (black). Homes with flexible frontages, small shops and community uses line the main street (red)
Upton Design Code, Version 2, March 2005: figures 5.1, 6.1, 7.1 and 9.1, redrawn in this site’s colours.
180UPTON / 12181
UPTON / 12 · Built
Sites A and B were the first two sites built under the code, and their streets read as one place.
Upton in July 2006. Photographs from the EDAW project files.
182UPTON / 12183
UPTON / 12 · Poundbury
The Prince’s Foundation brought Poundbury to Upton. The critics had already made up their minds.
Poundbury began in 1993.
What the critics said
“Feudal Disneyland.”
The nickname, as The Guardian recalled it, 27 October 2016
“Fake, heartless, authoritarian and grimly cute.”
Stephen Bayley, “I’ll show you a real carbuncle, Charles”, The Guardian, 7 December 2008
“A prince’s plaything or architectural theme park?”
The New York Times, reprinted in The Irish Times, 4 October 2022
“The Royal Dystopia of Poundbury.”
Current Affairs, 3 May 2021
Twenty years on, the press
“Is Prince Charles’s model village having the last laugh?”
Oliver Wainwright, The Guardian, 27 October 2016
“Why Prince Charles’s ‘Disneyesque’ model village is proving critics wrong.”
Matt Oliver, The Telegraph, 11 May 2022
“Labour is right to build new towns in Poundbury style.”
Nicholas Boys Smith, UnHerd, 27 September 2025
Twenty-six years on, the market
43%
more value per hectare than neighbouring Dorchester
25%
premium on resales over the local market
Savills, “Significant premiums for developers and homeowners in sustainable mixed-use communities”, 12 September 2019.
Poundbury from the Great Field. Photograph: Milos Ruzicka / iStock.
184UPTON / 12185
UPTON / 12 · Reception
2007
Upton won the Sustainable Communities award at the RTPI Planning Awards.
The award went to the whole team: EDAW, English Partnerships, Northampton Borough Council, The Prince’s Foundation and West Northamptonshire Development Corporation.
The Prince’s Foundation brought the lessons of Poundbury to the table. Upton wrote the same idea into a code.
What the press said
“The fact that the development is on public land, and that English Partnerships can accordingly impose diktats on the developers, is at the heart of Upton’s high-quality design and place-making.”
Tim Williams, “Solid developments on the home front”, Regeneration & Renewal
“Something exciting is happening in Britain’s suburbs.”
The Economist, “Field of dreams”, 29 July 2006
The Prince of Wales, now King Charles III, with developer Paul Newman beside a model of Upton. Photograph: James Corbett, Northampton Chronicle & Echo. Award: RTPI Planning Awards 2007, winner’s certificate.
The line in this chapter: Ukaz Street and the Main Square, the east–west spine
Heart of Doha
The call
Let the Diwan set the skyline: low beside the palace, and tall only at the far edge.
190HDOHA / 13191
Ukaz Street crosses the new grid from west to east, below the Amiri Diwan. Heights stay at three to four storeys beside the Diwan.
Blocks and Ukaz Street traced from the illustrative masterplan, EDAW, 2006.
192HDOHA / 13193
HDOHA / 13 · Method
The design team read the old city from aerial photographs taken between 1947 and 2004.
The photographs showed the course of an old wadi. Souk Waqif is built along the bending edges of the wadi, and the wadi once ran on along Musheireb Street to the bay. The plan brings the wadi back as a channel of water beside Musheireb Street.
The plan sets a western street grid against the intricate pattern of the old Arab town.
Three schemes came out of the charrette: Climate Blocks, Culture Squares and Civitas. Civitas combined the other two and became the plan.
01 / The street grid runs north-north-west, so it carries the cars and catches the sea breeze02 / Walkways and courtyards run inside the blocks and step from public to private03 / Channels of water run through both, and the channel beside Musheireb Street recalls the old wadi
The prevailing wind comes from the north and north-west and carries the cool sea breeze. Blocks laid out north to south let the breeze flush heat out of the streets and keep the streets in shade for most of the day. Colonnades shade the east-west streets, and wind towers, water and planting cool the spaces in between, as they did in the old town.
01 / Tall, close walls keep the street in shade02 / North-south blocks let the sea breeze through and shade the streets from the low sun03 / Wind towers catch the breeze above the roofs and pull it down into the buildings
The grid carries the streets and the traffic. Courtyards and walkways run inside the blocks, and new squares open where the two meet. Heights stay at 3–4 storeys beside the Amiri Diwan and rise to 10–20 storeys only along Musheireb Street. Detailed masterplans would fix the plots and the buildings later.
Massing model of the illustrative masterplan. EDAW, 2006.
200HDOHA / 13201
HDOHA / 13 · As built
Msheireb Downtown Doha keeps the grid of streets and the courtyards inside the blocks.
Msheireb Downtown Doha as built: a view over the district towards Doha Bay, a colonnade, a courtyard and a street with the tram. Photographs: Hufton + Crow. Plan: EDAW | AECOM.
202HDOHA / 13203
HDOHA / 13 · The grid and the lattice
The grid and the lattice.
The 2006 conceptual masterplan and its design codes set the frame for the district. The site was later built as Msheireb Downtown Doha.
35 hasite2006 conceptual masterplan
759,365 m²floor area38% homes, 35% offices
31 haas builtMsheireb Downtown Doha
Recognition · 2012
AECOM’s masterplan for the Heart of Doha won Future Project of the Year at the World Architecture Festival.
Recognition · 2021
The Msheireb Downtown Doha masterplan won a RIBA International Award for Excellence.
Masterplan study / University extension · EDAW · senior urban designer · 2007–09
The line in this chapter: the main street, from Huntingdon Road round the local centre to Madingley Road Masterplan, EDAW | AECOM, 2014
North West Cambridge
The call
Run one main street from Huntingdon Road to Madingley Road, and gather daily life around one local centre.
210NWCAM / 14211
One main street runs from Huntingdon Road round the local centre to Madingley Road. Daily life gathers along the street and around the local centre.
Main street traced from the aerial view of the masterplan, EDAW | AECOM, 2014.
212NWCAM / 14213
NWCAM / 14 · Structure
120 hectares of University farmland lie between Huntingdon Road, Madingley Road and the M11.
The University of Cambridge planned the largest extension in its 800-year history. The study set out research and teaching space, homes for University staff, market housing, community buildings and open space on one site.
01 / A green corridor runs south through the site, and the new streets tie into Huntingdon Road and Madingley Road02 / Urban blocks line the main streets, and gateways and landmark buildings mark the way in03 / One of the study approaches
04 / The market square in the local centre, as built
Urban design diagrams and a study approach, EDAW, masterplan study. Market square: photograph, Eddington, North West Cambridge Development. Homes, rooms and research space: the consented masterplan, AECOM, 2013–14.
214NWCAM / 14215
NWCAM / 14 · Built
The site was later built as Eddington, the new quarter of the University.
AECOM, formerly EDAW, carried the masterplan to planning consent in 2013. The first homes, colleges and shops opened from 2015, and the quarter is due to be complete by 2030.
120 hasitemasterplan study
3,000homeshalf for University staff
2,000postgraduate roomswith 100,000 m² of research space
Recognition · 2014
AECOM’s masterplan for North West Cambridge won the Future Projects Masterplanning award at the World Architecture Festival.
Eddington from the air. Photograph: Eddington, North West Cambridge Development.
216NWCAM / 14217
Chapter IV · Method
Every plan in this book was asked the same two questions: who is it for, and what is it worth? I run this method through D2V, my advisory practice. This chapter shows how the questions are asked, and how AI does the reading so the judgement gets the time.
Value is made or lost at five points before anything is sold.
A masterplan passes through five hands: the brief, the land, the plan, the product and the sale. At each one, value can be added or quietly given away. I read every plan along this chain and put a number on what each decision is worth.
01
Brief
A brief that asks for the wrong product.
Dahyat AlFursan: a housing brief became a regional district for Riyadh.
02
Land
Land valued for what it is, not for what it can become.
Ras Abu Qames: the good beach kept for homes and a resort, industry on the poor shore.
03
Plan
Plots cut for the drawing, not for the buyer.
Yanbu: +66% floor space on the same streets.
04
Product
Product the market will not absorb, or pays for slowly.
Park Avenue: hotels became homes that sell off-plan.
05
Sale
Later phases that damage what was already sold.
Dubai Healthcare City: +2.5M ft² (about 232,000 m²), with the height kept away from the villas already sold.
Black: the value a plan holds at each step. Red: the value the plan could hold. Examples from the chapters of this book.
220IV — Method221
METHOD / 02 · The approval pathway
A plan that stalls at the permit loses money every month it waits.
I have sat on the consultant’s side, the authority’s side and the owner’s side. So I review a design the way the authority will, before it is submitted, while the problems are still cheap to fix.
01
Brief check
The area schedule, ratios and parking are tested before design starts.
Gaps found here cost a conversation.
02
Concept review
The plan is read the way the authority will read it.
Problems found here cost days.
03
Permit pre-check
The drawing set is tested against the zoning code and the building code, sheet by sheet.
Problems found here cost a week.
04
Submission
The plan goes in with the known risks already closed.
Problems found after this point cost months.
The cost of fixing a problem, by where it is found
Illustrative. The later a problem is found, the more it costs to fix.
222IV — Method223
METHOD / 03 · The tools
AI reads the documents. I make the call.
A masterplan review means hundreds of pages of drawings, codes and schedules. I have built a set of AI-assisted review tools that read those documents against the rules and return a structured finding. The reading takes hours instead of days, and the time saved goes into the judgement.
Documents
drawings, codes, schedules
AI reads
against the rules
Finding
structured, sheet by sheet
My call
judgement and price
Decision
before money is spent
ToolReadsReturns
Pre-acquisition screenA land offer, the plot and its planning rules.Capacity, a test fit, the residual land value against the asking price, and a price ceiling.
Brief pre-checkA client brief or area schedule.The gaps, the ratios and the parking, with a ready, fix-first or not-ready verdict.
Value checkA villa, townhouse or apartment type at any design stage.The build cost against what the price can carry, with savings ranked by value.
Permit pre-checkA villa or townhouse drawing set.A pass-or-fix list against the local zoning code and the Saudi Building Code.
Approval-risk reviewA design submission.Where the permit will stall, for how long, and what the delay costs.
224IV — Method225
METHOD / 04 · Worked examples
Each saving came from a design decision, priced before anyone redrew the plan.
Three plans, read with an owner’s eyes. The schemes are anonymous; the decisions and the numbers are real.
As drawn: surface parkingRe-cut: the park over the parking
Worked example · a mid-market housing scheme, Eastern Province
SAR 87M
of added net value at the central case, from one change: the park was put over the parking. The analysis tested the change against cost and sales value before anyone redrew the plan.
As drawn: 673 scrapsRe-cut: six parks
Worked example · a large residential masterplan
SAR 180M
saved over 30 years by designing out leftover land. The layout left 673 green scraps, 358 m² on average, that nobody can use as a park. Together the scraps cover 24 hectares, as much land as six neighbourhood parks. I put a price on that design decision: SAR 334 million to build and maintain as irrigated grass over 30 years. Redesigned into fewer parks that people actually use, the same open space costs about half.
As drawn: land beyond the standards (dark grey)Re-cut: 6.45M m², 16% of the site, released for homes (red)
Worked example · a large housing district, Riyadh
SAR 14.9B
of developer NPV, found by re-reading the district with an owner’s eyes. The plan set aside 6.45 million m², 16% of the site, for social facilities beyond what the planning standards require. Released for homes, that land carries the value.
Every one of these plans was approved on paper. Read for what it was worth, each one gave value away. Reading a plan for its value is what I do.
226IV — Method227
Before · 1998–2006
Before
The method started on a hospital site in the middle of Oxford. I read the site first as streets, connections and a point of focus, and only then as buildings.
The Radcliffe Infirmary, Woodstock Road, Oxford. Urban design plan of the district. Student work, Joint Centre for Urban Design, Oxford Brookes, 1998.
TMC Architecture · Port of Spain · 2003–2006
I spent three years in practice in Trinidad before London, working on housing, a new-town neighbourhood, a showroom and three towers.
East Gate on the Greens2005–06
Trincity · under construction
Bon Air Gardens2004
Tacarigua
BMW Dealership, Bavarian Motors2004
Port of Spain
One Woodbrook Place2005
Port of Spain
East Gate on the Greens, Trincity, under construction in 2005–06. Housing planned around a formwork system, chosen before the drawing began. The method set the cost. Design images: TMC Architecture project team, 2004–05. East Gate photographed under construction, 2005–06. One Woodbrook Place as built; photograph: One Woodbrook Place.
228Before229
Built · 2017–18
Belle Air 166
The villa sits in the hills of St Ann, Jamaica, facing the sea.
Wesley Sturridge, private practice
Belle Air 166, St Ann, Jamaica. Design: Wesley Sturridge, 2017–18; image re-rendered with Rendair from the design model, 2026.
Atlas of works · 1994—2026
Atlas of works
37 works in seven countries. The chapters are marked with an arrow; sixteen more follow in short.
1994–2003Urban Development Corporation, KingstonUrban Designer / Architect
1998–1999Oxford Brookes UniversityMA Urban Design
1996–1998Oxford Brookes UniversityPgDip Architecture · RIBA Part II
1990–1994University of Technology, JamaicaBA (Hons) Architecture
232Atlas of works233
Atlas of works · More works
Sixteen more projects, each with its own decision, wait for the next edition.
ALWSL / 17 · Dubai
Al Wasl–Jumeirah
One-way traffic used as the catalyst to remake the public realm of the Jumeirah corridor.
Urban design strategy
Parsons · 2012–17 · for the RTA
JBLAH / 18 · Dubai
Jebel Ali Hills
A 629 ha community for 69,000 people, held together by open space.
Urban design strategy
Parsons · 2012–17 · for Meraas
QTFAN / 19 · Doha
Qetaifan Islands
A 270 ha man-made island off Lusail: souk, villas and waterfront townhouses.
Urban design strategy
Parsons · 2012–17 · for Lusail Development
SDYAT / 20 · Abu Dhabi
Saadiyat Island
A 2,700 ha island of seven districts, around the cultural district.
Design concept · presentations
EDAW · 2006–09
ZSCTY / 21 · Abu Dhabi
Zayed Sport City
A sports institute set within homes, retail and a recreation complex.
Urban design strategy · design concept
EDAW · 2006–09
ANAPA / 22 · Anapa
Anapa Wine & Golf Resort
A golf and residential resort on 1,622 ha, set into a working vineyard and forest.
Design project manager
EDAW · 2006–09
EMBNK / 35 · St Petersburg
European Embankment
St Petersburg’s grid was bent to fit an irregular site opposite the Hermitage, and its boulevards open onto a public esplanade on the Neva.
Urban design strategy · development figures
EDAW · 2007
BOOTS / 23 · Nottingham
Boots Head Office Site
A headquarters site turned into a place to live, work and invest, over twenty years.
Urban design strategy · development figures
EDAW · 2006–09 · for Boots Group plc
WLWCH / 24 · London
Woolwich Crossrail
The regeneration case for a Crossrail station: capacity over and around the site.
Design concept · development figures for financial feasibility
EDAW · 2006–09 · for the London Borough of Greenwich
EALNG / 36 · London
Ealing Housing Estates
The borough’s 34 largest estates were appraised in twelve weeks, and seven were chosen to go first, each with a capacity study, costings and delivery advice.
Urban design strategy · development figures
EDAW · 2007 · for the London Borough of Ealing
RCHST / 25 · Rochester
Rochester Riverside
An appraisal of the riverside masterplan, read from Rochester’s historic form.
Urban design appraisal
HTA Architects · 2009–10 · for SEEDA and Medway Council
RHGDN / 26 · London
Robin Hood Gardens
An urban analysis of a contested estate, for the Blackwall Reach regeneration bid, which was won.
Urban design appraisal · the bid was won
HTA Architects · 2009–10 · Blackwall Reach, for Tower Hamlets and the HCA
BRCHF / 27 · London
Birchfield Estate
An East London estate re-read for its public realm and new sites.
Urban design appraisal
HTA Architects · 2009–10
CHSNT / 28 · Cheshunt
House extension
A single-storey rear extension to a family house: a new kitchen and breakfast room under a warm roof with rooflights.
Architect · drawings to building regulations
Wesley Sturridge, private practice · 2021 · structure by RWA London
LIGPK / 29 · New Kingston
Liguanea Park, competition
A civic park for New Kingston on one crossing axis, with two granite fountains. The site was later built as Emancipation Park.
Competition entry · author
Kingston · the site opened as Emancipation Park in 2002
EPOSR / 37 · Port of Spain
East Port of Spain
A new linear park ties the city centre to the waterfront, and the East Dry River, the heritage sites and the market become the reasons to invest east of the centre.
Urban design strategy · development figures
EDAW · 2008 · for the East Port of Spain Development Company